Conversation
Notices
-
Brony Systems Report: PON Reactor 3 is operating at 82% capacity. Level 5 obtained. Current exposure is up to the 6th digit. System integration with user-based input adjusting canon levels and strength of dimensional interlock boundary theories initiated. No anatomic anomalies detected.
Friday, 22-Jul-11 07:58:29 UTC from web-
@ans1 Fluctuation between Level 3 and Level 6 status has been observed. Overall stability is at Level 5. Fluctuations appear to be triggered by self-analysis in respect to PON3 Core and Reality Simulation Core.
Friday, 22-Jul-11 08:32:44 UTC from web
-