fisherpon's status on Friday, 22-Jul-11 07:58:29 UTC
-
Brony Systems Report: PON Reactor 3 is operating at 82% capacity. Level 5 obtained. Current exposure is up to the 6th digit. System integration with user-based input adjusting canon levels and strength of dimensional interlock boundary theories initiated. No anatomic anomalies detected.